Yaaaay!
I cannot describe the paramount joy that I feel now that we have finally got running hot water!
The engineer came out earlier and had a look at it the water heater and the control system. He left the settings as I’d had them a few days back and fiddled with a few switches.. Then he then told my flat mate that the water should be hot in 4-5 hours.. so imagine my shock when I switched on the tap and out flowed hot water! To say I was excited is an understatement! Especially after the cold shower that I had this morning before work.. brrr..
I love checking things off my list as I’m going..
Water – Check!
Council Tax – Check!
Heating – Check!
Hot water – Check!
Things left to do..
Broadband/Phone line
Electricity
My flat mate said that she would do those elements, but I have been looking for some broadband choices to see if I can get a better deal than what she is being offered..
We shall see.. 🙂
~ by originalapplejunkie on June 16, 2014.
Posted in Uncategorized
Tags: checklist, Cold, electrical, engineer, hot, List, Shower, System, to-do, Water
Good luck with continuing to settle in. It’s a nightmare sorting all those household bills thingys isn’t it?!
It really is.. I think it has all been sorted now though.. Hopefully.. We won’t know until we don’t have something lol